Germany only: Einstieg in deutsche Bestandsanlage groesser 15 MWel plus Waerme/ Kaelte zum Weitertrieb vor Ort (Investition / Partnerschaft) Biomass / Waste Steam Turbine Generator Needed

50 Hz, Biomass / Waste Steam Turbine Generator, Germany only: Einstieg in deutsche Bestandsanlage groesser 15 MWel plus Waerme/ Kaelte zum Weitertrieb vor Ort (Investition / Partnerschaft) Kostenuebernahme von faelligen Investitionen/ Revisionen - Sicherstellung der Energie u. Medienversorgung der Produktion (Strom, Dampf, Kaelte) - bei Neubau/ bei Revision der Anlage/ Anlagenteile ab dem Jahr 2020 - partnerschaftliche Zusammenarbeit (falls gewuenscht Teilhaber des neuen Anlagenparks), Kaufpreis abhaengig von Investitionssumme und voraussichtlicher Betriebsdauer, ...





ab ca. 20 MW Leistung - Standort in Deutschland bevorzugt Gas / LNG Combustion Engine / Diesel Generator Needed

50 Hz, Gas / LNG Combustion Engine / Diesel Generator, ab ca. 20 MW Leistung - Standort in Deutschland bevorzugt 2020 - 2022: Betriebsfuehrung uebernehmen, Partnerschaft beginnen, Beteiligung oder Gesamtkauf taetigen an einem Gasmotorenkraftwerk, als Neubau oder als zu optimierende Bestandsanlage. Investor ist ein kapitalstarker Investor aus der Energiewirtschaft, Preisvorstellung variable; haengt vom Projekt ab; soll den Eigentuemer bei den Invest-Kosten entlasten, ...





(3x or 4x) 45 MWe to max. 60 MWe simple cycle power plants or - preferred - gas turbine generator sets Gas / LNG Gas Turbine Generator Needed

50 Hz, Gas / LNG Gas Turbine Generator, (3x or 4x) 45 MWe to max. 60 MWe simple cycle power plants or - preferred - gas turbine generator sets An internationally active utility company is looking for up to 4 hardly used Siemens SGT-800 gas turbines, ideally with 10.5 kV output generator or comparable GT-generator sets; as new or max. 5 years old; 0 to max. 50.000 EOH; needed for Western Europe until December 2020, Price no more than 35% of comparable new equipment (offer price without installation and commissioning), ...





ideally between 60 to 90 MWe, for continued operation at existing site, boiler with pulverised coal injection Coal Steam Turbine Generator Needed

50 Hz, Coal Steam Turbine Generator, ideally between 60 to 90 MWe, for continued operation at existing site, boiler with pulverised coal injection Fuel conversion project to extend life-time of existing coal-fired TPP with high calorific Coal Replacement Biomass Fuel; preferred plant location: Canada, US, Europe; take-over or long-term joint venture both possible; PPA preffered; operating permit preferred; easy fuel import access preferred, price will negotobale, depending on business case, ...





ab 20 MWel, gerne auch mehr, Standort in Deutschland, Uebernahme oder Beteiligung an Bestandsanlage Gas / LNG Gas Turbine Generator Needed

50 Hz, Gas / LNG Gas Turbine Generator, ab 20 MWel, gerne auch mehr, Standort in Deutschland, Uebernahme oder Beteiligung an Bestandsanlage Europaeischer Energiekonzern sucht in Deutschland ab Herbst 2020 als (Ko-)Investor oder Partner zum Weiterbetrieb vor Ort mind. ein GT-, GuD-, KWK-Kraftwerk ab 20 MWel, entweder bei Neubau oder bei Revision / Umbau der Anlage bzw. von Anlagenteilen, Preis waere abhaengig von Investitionssumme und Anteilsuebernahme; Vorleistungen des Alteigentuemers werden beruecksicht, ...